The project involves the construction of a cogeneration plant of electrical and thermal energy to supply the AGC glass manufacturing plant with the possibility of recovering and reusing heat for the district heating of the city of Cuneo.

The approximately 45 km of excavations for pipe installation has been used for drawing up an optic fibre data network. The network allows the interconnection of all the distribution substations and the provision of other services.


Project inauguration:

  • October 2018
  • District heating network length: 45 km
  • Users: about 400 users (public and private)
  • Expected energy production: > 170 GWh/year


Implemented BMS system based on iSMA products:

  • 1 iSMA-B-8000
  • 1 iSMA-B-MIX-18-IP