Building of new construction, it is composed of 56 dependencies, between rooms of professors, Classroom, etc. Air conditioning and air quality are controlled in the 19 Classrooms. It also controls 4 AHU, Production of Sanitary Hot Water and 3 AERMEC heat pumps for air conditioning, all by Modbus.
Implemented BMS system based on iSMA products:
- 56 iSMA-B-FCU-HH
- 56 iSMA-B-LP
iSMA Distributor: